Construction Attention-HDPE Corrugated Pipe

2023-10-12

In view of its unique structural design and high efficiency and economy in engineering applications, HDPE corrugated pipe is widely used,however, in the construction process, we still need to pay attention to the following requirements:

HDPE Corrugated Pipe Construction Attention

1.**Pipe Laying Specifications**

Normally, HDPE corrugated pipe should be laid in straight lines. When the hdpe pipe is located under the motorway, the thickness of soil cover shall not be less than 0.7 meters. If the HDPE double-wall corrugated pipe needs to cross the railroad or high-grade highway, it must be set up protective casing made of reinforced concrete, cast iron and other materials, and the casing design needs to be in line with the relevant standards of the roadbed.

2.**Trench Excavation Standard**

The width of trench bottom shall be determined by hdpe corrugated pipe OD plus 0.6 meters. In the excavation process, if there are hard objects or other obstacles at the bottom of the trench, make sure to remove them so that the construction workers can complete the operation smoothly.

3.**Construction Requirements Under Special Climatic Conditions**

When rain or snow is encountered, the length of the trench excavation should be minimized. If water accumulates in the trench, it should be drained in time. At the same time, we should ensure that excavation and backfilling are completed quickly to avoid affecting the stability of the trench.

The above points need to be paid special attention in the use of HDPE double wall corrugated pipe for construction matters, and these guidelines could ensure project quality and safety.